Skagit Valley College Project: Managing the Whole Picture from Start to Finish

Skagit Valley College Asphalt

At Ritter Dirt & Asphalt, some projects are about much more than what you see on the surface.

Our recent project at Skagit Valley College is a great example. Ritter Dirt & Asphalt served as the General Contractor, managing the project from start to finish while coordinating multiple subcontractors, navigating existing infrastructure, improving accessibility, and keeping safety and scheduling at the forefront every step of the way.

Creating Safer, ADA-Compliant Walkways

One of the primary components of the project was removing the college’s existing paver walkways and replacing them with new concrete walkways designed to bring the area into ADA compliance.

That meant looking beyond simply removing one surface and installing another. Grades, transitions, accessibility, drainage, surrounding infrastructure, and the finished usability of the space all had to work together.

It’s exactly why we believe in looking at the whole picture before the work begins.

Going Approximately 12 Feet Underground

While the new concrete is what students, staff, and visitors will see every day, some of the most complex work happened well below the surface.

Ritter worked directly with the electrical contractor to coordinate the installation of conduit through the existing utilidor approximately 12 feet underground.

Working at that depth and around existing infrastructure requires careful planning, communication, and an unwavering focus on safety. Our team helped coordinate the work so each phase could move forward efficiently while the different contractors involved had what they needed, when they needed it.

More Than Dirt & Asphalt

Projects like Skagit Valley College showcase the full scope of what Ritter Dirt & Asphalt can bring to a project.

As the General Contractor, our responsibility extended beyond our own scope of work. We coordinated schedules, managed subcontractors, communicated between trades, addressed challenges as they arose, and kept the project moving from the initial demolition through completion.

Because a successful project isn’t just about doing your portion of the job well. It’s about making sure all the pieces work together.

That’s the thinking behind our Final First Approach™.

We consider the finished project from the beginning, identify what needs to happen along the way, and coordinate the work accordingly. The goal is fewer surprises, better communication, safer jobsites, and a finished product that works the way it should.

Built for the Final Result

From removing existing pavers and constructing new ADA-compliant concrete walkways to coordinating electrical work approximately 12 feet underground, the Skagit Valley College project required planning at every level.

We’re proud of the finished result and proud to have managed a project that will help provide a safer, more accessible space for the Skagit Valley College community.

Planning a commercial, municipal, institutional, or large-scale residential project in Whatcom or Skagit County?

Ritter Dirt & Asphalt brings excavation, asphalt, site work, utilities, drainage, concrete coordination, and project management together with one goal in mind: getting the final result right from the start.

Don’t be bitter… just call Ritter.